AI & Automation

Electricity Sub-Metering per Production Line: Where to Put Meters and What to Do With the Numbers

November 11, 2026 · 6 min read · Etzal Group Team

A factory's electricity bill rises 12 percent while output is flat. The plant manager suspects line two. The maintenance head suspects the air compressors. The finance head suspects the tariff. All three may be right, and with one meter at the gate nobody can show it. Electricity sub-metering replaces the argument with measurements: this line, this machine, these hours.

What sub-metering answers

  • Where does the energy go, by line and by major load?
  • How much energy does each unit of product take?
  • How much is consumed when nothing is being produced?
  • When does peak demand occur, and what causes it?
  • Did a change we made actually save anything?

If you cannot say which of these you want answered, wait before buying meters.

Plan in three levels

Level 1: the incomer. One meter at the main supply, matching the utility meter. It is your reference: the sum of everything below should come close to it.

Level 2: lines and areas. One meter per production line, plus utilities, offices, warehouse and lighting where they are separately fed. This is where the first useful comparisons come from.

Level 3: significant loads. The few large consumers: compressors, chillers, furnaces, large motors, extruders. In many plants a small number of machines take a large share of the energy.

Build from the top down. Level 1 and 2 first, then add level 3 where level 2 shows something worth investigating.

Follow the wiring, not the floor plan

The practical constraint is the electrical distribution. A meter measures what one feeder supplies. If line two and half the lighting share a distribution board, a meter on that feeder measures both.

Before planning, obtain or draw the single-line diagram: main panel, sub-panels, feeders and what each supplies. Walk it with the electrician. Old plants rarely match their drawings.

Where a line is fed from several panels, you need several meters summed, or you accept a meter that covers a group and estimate the split.

Choosing meters

Check these points.

  • What it measures. At least energy in kilowatt hours, active power, voltage, current and power factor per phase. Demand and harmonics are useful for larger loads.
  • Accuracy class. For internal comparison, class 1 is commonly sufficient. For billing tenants or allocating cost formally, higher accuracy and certification may be required.
  • Current transformers. Sized to the actual load, not just the breaker. A transformer rated far above the real current reads poorly at low load. Split-core types allow installation without disconnecting cables.
  • Communication. Modbus over RS-485 is the common wired choice, with Modbus TCP, or wireless options where cabling is hard.
  • Logging interval. One-minute or fifteen-minute data. Fifteen minutes is enough for cost and efficiency, and one minute helps when you want to see machine cycles.
  • Local storage. A meter or gateway that keeps data during a network outage avoids gaps.

Label every meter with what it feeds, in the words people use on the floor.

Getting the data together

Meters connect to a gateway, which sends readings to a database and a dashboard. Two things matter more than the software brand:

  • Time alignment. All meters stamped on the same clock, so sums and comparisons are valid.
  • Production data alongside. Energy alone says little. Energy per unit needs the output count for the same line and period. Plan how production figures get into the same system, even if at first someone types the shift totals.

Validate before trusting

  • Sum the level 2 meters and compare with the incomer. A gap of a few percent is expected from unmetered loads and losses. A large gap means something is missing, miswired or misconfigured.
  • Check for a current transformer installed backwards: negative power or a strange power factor is the sign.
  • Check the transformer ratio in the meter settings. A wrong ratio multiplies every reading.
  • Compare one month of the incomer with the utility bill.

The four numbers to watch

1. Energy per unit produced. Kilowatt hours per tonne, per thousand pieces, per batch. Track it by line and by product. This is the number that shows efficiency, because it removes the effect of volume.

2. Idle and base load. What each line draws when not producing: at night, on Sundays, during breaks and changeovers. This is often the largest easy saving. Equipment left running, compressed air feeding leaks, heaters holding temperature for nothing.

3. Peak demand. Where your tariff charges for maximum demand, the highest interval in the month sets part of the bill. See which loads coincide to create it, and whether starts can be staggered.

4. Power factor. Low power factor may attract penalties and wastes capacity. Meter data shows where correction is needed.

From numbers to action

Typical findings in the first three months:

  • A line that uses nearly as much on Sunday as on a working day. Something is not being switched off.
  • Compressors running loaded all night. Leaks.
  • Two identical lines with different energy per unit. A setting, a worn component or an operating habit.
  • A demand peak every Monday at 07:00. Everything starts at once.
  • A rise in energy per unit on one machine over weeks. Wear, fouling or drift, visible before failure.

Each finding needs an owner and a date. A weekly thirty-minute review with production, maintenance and finance is the mechanism that converts meters into savings.

Allocating cost to products

With energy per line and production per line, energy cost can be assigned to products by actual use instead of by floor area or headcount. Products made on energy-hungry processes stop being subsidised by the rest. This often changes the view of which products are profitable.

Common mistakes

  • Metering everything at once. Start with levels 1 and 2.
  • Planning from the floor plan and not the single-line diagram.
  • Oversized current transformers.
  • No production data, so energy cannot be related to output.
  • No validation against the incomer.
  • A dashboard nobody reviews.
  • Expecting the meters to save energy.

Safety

Installing meters means working in electrical panels. Use qualified electricians, follow isolation and permit procedures, never open-circuit a current transformer secondary under load, and plan a stop where live work cannot be made safe.

We design and install energy monitoring as part of our IoT and Control Systems work, starting from the single-line diagram and the questions the plant wants answered. To discuss your site, contact us.

Summary

Decide the questions first. Plan meters in three levels following the electrical distribution: incomer, lines and areas, then the largest loads. Choose meters with suitable transformers, communication and logging, and validate the sum against the incomer. Bring production data alongside. Watch energy per unit, idle load, peak demand and power factor, and review them weekly with named owners for each action.

Frequently asked questions

How many sub-meters does a factory need?

Start with enough to explain most of the bill. Typically that means the main incomer, each production line or large area, and the few biggest single loads such as compressors, chillers and furnaces. Ten to twenty metering points often account for the large majority of consumption in a mid-sized plant. Add more only where a question remains unanswered.

Does sub-metering save energy by itself?

No. Meters only measure. Savings come from what people do with the numbers: switching off idle equipment, fixing compressed air leaks, shifting loads, correcting settings. Plants that install meters and never review the data see no change. Plan the weekly review before buying the hardware.

Can sub-meters be installed without stopping production?

Often, yes. Split-core current transformers clamp around existing cables without disconnecting them, and voltage connections can sometimes be made at existing terminals. Work in a live panel is hazardous and must be done by qualified electricians under your site's safety rules. Some installations will need a short planned stop.

Author

Etzal Group Team

Etzal Group Team, helping businesses grow with technology. Contact us.

Related service

WhatsApp AI Chatbot

We build, train, and run a WhatsApp AI agent that answers customers 24/7, qualifies leads, and follows up.