Indonesia's New Sustainability Reporting Starts With 2027 Data: Get Scope 1 and 2 Metering Ready
November 13, 2026 · 5 min read · Etzal Group Team
Indonesia's Financial Services Authority (OJK) is preparing a draft regulation that adopts the IFRS S1 and IFRS S2 standards to replace its existing rule, POJK 51/2017, taking effect on 1 January 2027 at the earliest. According to Kompas.com on 29 August 2026, the largest group of entities applies it from the 2027 data period and submits reports in April 2028, with Scope 1 and Scope 2 emissions as mandatory disclosures.
The rule is still a draft according to the sources we read. Its first data period, however, begins in a matter of weeks. Energy use that goes unrecorded in January 2027 cannot be measured again in 2028.
What has been reported about the draft
Kompas.com summarises the main points of the draft POJK (an OJK regulation):
- Phasing. Group 1, the largest entities, applies IFRS S1 and S2 from the 2027 data period, with reports submitted in April 2028. Groups 2 and 3 follow. Entities with small assets are exempt from full application but still report in a simpler format.
- Emissions. Scope 1 and Scope 2 must be disclosed. Scope 3 gets a two-year preparation period, with coverage limited to business travel.
- Initial coverage. For the first three years, only climate-related risks and opportunities are mandatory disclosures.
- Verification. Verification by an independent third party becomes mandatory no later than two years after disclosure begins. The example given: Group 1's 2027 data is verified in 2029.
Retnia Wulandari, a manager in OJK's Sustainable Finance Directorate, was quoted by Kompas.com on 29 August 2026 as saying that Scope 1 and Scope 2 must be disclosed.
Katadata on 17 September 2026 quoted OJK Chair Friderica Widyasari Dewi as saying the rule is being drafted by adopting various international standards and, God willing, will be enacted in early 2027 (our translation). The aim, according to that report, is to prevent greenwashing.
The limits of this information
- The POJK had not been issued according to the sources we read, and those sources date from August and September 2026. The final text may differ from the draft.
- The criteria for Groups 1, 2 and 3 are not detailed in the sources, so we cannot say which group your company falls into.
- The obligation applies to financial services institutions, issuers and public companies.
Check OJK's latest official announcement before setting an internal timetable.
Why suppliers are affected too
The draft does not require suppliers to report. What follows is our view, not the content of the rule. Companies that must report, and will later be verified, need reliable data from their supply chain, and reporting banks will ask their borrowers. A mid-sized supplier that already has energy figures per site will find such questionnaires far easier to answer than one that has to rebuild them from a pile of invoices.
That is the practical side of the Indonesia sustainability reporting 2027 data period: the numbers have to exist before anyone asks for them, even though the first reports are not due until 2028.
Scope 1 and Scope 2 in factory terms
Put simply, Scope 1 is emissions from fuel you burn yourself: diesel for generators, gas for boilers, petrol and diesel for operational vehicles. Scope 2 is emissions from the electricity you buy. Both are calculated from activity data, meaning litres, cubic metres and kWh, multiplied by an emission factor.
Emission factors are a matter of methodology, best settled with your sustainability consultant. Activity data is a matter of measurement, and that is what has to be running on 1 January.
What must be metered from January 2027
This is our advice as designers of measurement systems.
| Source | Activity data | Recording that survives verification |
|---|---|---|
| Grid electricity | kWh per site per month, better per day | Main meter read automatically and reconciled to the bill |
| Generators | Litres of diesel used | Flow meter, or refuelling log with purchase proof |
| Boilers and furnaces | Gas or other fuel per month | Gas meter or scale, not an estimate |
| Operational vehicles | Litres per vehicle | Fuel card or scanned receipts, by licence plate |
| Cooling | Refrigerant added | Service records with type and weight |
Three principles make this data verifiable later:
- Record at the source. A figure read by a meter and stored directly is stronger than one copied by hand into a spreadsheet at month end.
- Keep the trail. Every figure has an origin, a time, a unit and a correction history with the name of whoever corrected it.
- Name an owner. One person per site is responsible for completeness, and one person centrally for consolidation.
If third-party verification arrives two years after disclosure begins, as in the example Kompas.com reports, the trail is what gets examined, not only the final number.
Automated or manual
Not everything needs a sensor. Weigh it source by source:
- Electricity: the best case for automation. A digital meter on the main panel is relatively easy to install and also helps manage cost.
- Generator and boiler fuel: automate where volumes are large. For small volumes, a disciplined refuelling log with purchase proof is adequate.
- Vehicles: fuel cards or a logging app make more sense than sensors.
Automation cuts copying errors and gives finer data, but it needs installation, calibration and upkeep. Manual recording is cheap at the start and expensive at verification. Many mid-sized companies will end up with a mix, which is fine as long as the rules are written down.
A seven-week plan to 1 January
- List every site and its energy sources.
- Check existing meters: which can be read automatically and which sites have none.
- Name a data owner per site.
- Install electricity meters at the largest sites first.
- Agree a form or app for fuel, with proof attached as a requirement.
- Set up a single store with a change trail.
- Test with December data, so that January is not the first attempt.
If you need metering and automated recording across several sites, our IoT and control systems team can help, and you can request a quote for the scope you need.
Note: reporting obligations, entity grouping and emissions methodology should be confirmed with OJK or your sustainability consultant.
Sources
- Kompas.com, 29 August 2026: OJK Siapkan RPOJK Baru, Verifikasi Laporan Keberlanjutan Wajib Dilakukan
- Katadata, 17 September 2026: OJK Siapkan Aturan Baru Laporan Keberlanjutan, Cegah Greenwashing, Berlaku 2027
Frequently asked questions
Has OJK issued the new sustainability reporting rule?
According to the sources we read, dated August and September 2026, it is still a draft planned for enactment in early 2027. Check OJK's official announcements for the current status.
Who has to report?
The obligation applies to financial services institutions, issuers and public companies. Kompas.com reports that Group 1 starts with the 2027 data period and reports in April 2028, but the group criteria are not detailed in the sources.
Which data must be ready first?
Electricity and fuel use per site, recorded from 1 January 2027 with a clear source, unit and change trail, since Scope 1 and Scope 2 are reported as mandatory disclosures.
Related service
WhatsApp AI Chatbot
We build, train, and run a WhatsApp AI agent that answers customers 24/7, qualifies leads, and follows up.